A dormer roof is small, high up and surrounded by slates or tiles. When it leaks, the water usually shows in a bedroom, and the cause can be the dormer top, its edges or the main roof around it.
Leeds has a great many flat-topped dormers. Some are old, built onto Victorian terraces when attics were first made into rooms. Many more were added with loft conversions from the 1970s onwards, on semis, bungalows and terraced houses. They are usually small flat roofs, often a single sheet of felt or rubber, with a drip edge at the front and the main roof slopes on each side.
Dormer roofs are awkward. They are high, so reaching them safely usually needs a scaffold or a tower rather than a ladder. They have three edges that meet other things: the front edge, which drains into a gutter, and the two sides, where the dormer cheeks meet the main roof. And the room below rarely has a loft space, so water travels straight into the ceiling.
Getting a dormer right means looking at the whole thing: the flat top, the trims, the cheeks and the lead or flashings where the dormer meets the slates and tiles. We are roofers, so the slates, the soakers and the valley around the dormer are checked at the same time.
A small flat roof with an old covering, often single-layer felt, that has cracked, blistered or lost its bond.
If the drip trim or gutter is poorly fixed, water runs back behind the fascia and into the window head.
The joint between the dormer side and the main roof relies on soakers, flashings or a lead apron. When these fail, water enters at the side and shows in the bedroom.
Where the dormer roof meets the main roof at the back, the covering has to be dressed up under the slates or tiles. A poor detail here is a common leak point.
Dormers usually need a tower or scaffold. The access is planned and shown as its own line on the written price, including any pavement licence on a street-facing dormer.
The flat top, trims, cheeks and the slates or tiles around the dormer are all inspected, so the right fault is fixed.
Where the covering has failed, it is stripped, the deck checked and renewed where soft, and a new EPDM, GRP or felt covering laid with proper trims.
The back of the dormer is dressed up under the main roof covering, and the sides get new soakers or flashings where needed.
Drip trims, fascias and the dormer gutter are fixed so water drops cleanly into the gutter instead of tracking back.
A small dormer roof can need the same scaffold as a much bigger job. Combining work, such as checking the chimney or main roof while the scaffold is up, can make sense.
Scaffold on a pavement in Leeds needs a licence from the council. We build the time for that into the plan.
Some older dormers have cheeks clad in slate, timber or lead. If the cladding is tired, it can be dealt with while access is in place.
In conservation areas and on listed buildings, changes to dormers can need consent. Like-for-like re-covering usually does not, but we will flag anything that looks different.
Water on a flat roof travels along the deck before it drips, so we trace it to the real entry point: an outlet, a joint, a wall or a seam.
More on this →The cover between a flat roof and a wall or chimney: cut into the joint, dressed down over the upstand and fixed, not glued.
More on this →Glass-fibre matting laid in resin and finished with a topcoat, moulded round corners and edges into one seamless skin.
More on this →Drip trims, gutters, outlets and the fascia boards along a flat roof edge, where most of the water leaves the roof.
More on this →Everywhere in the Leeds district. Pages for places where this work comes up a lot: Headingley, Hyde Park, Harehills, Burley, Kirkstall, Chapeltown. For anywhere else, type your town or postcode into the area finder.
We check the dormer top, its edges and the slates around it, and price the right fix in writing.